Here is how a blackout works without an ATS: the power dies, you find a torch, walk to the genset, crank it, walk back, flip the manual changeover — ten minutes if you are home and awake. If you run a villa for guests, nobody does any of that; the guests sit in the dark and write the review later. An ATS does the whole sequence in 8–15 seconds, every time, including when the villa is empty. Of everything we install, it has the highest satisfaction-per-rupiah of any upgrade — and it also protects PLN line workers by making backfeed into the grid physically impossible.
What's Included
ATS Panel Supply
Properly rated transfer panels — single-phase for villas, three-phase for commercial sites — using Schneider or ABB contactors, not the bargain contactors that weld shut after fifty cycles.
Wiring & Integration
Control wiring between your distribution panel, the ATS and the genset's start circuit. Tidy conduit runs, labelled terminals, and an as-built wiring sketch left inside the panel door.
AMF Controller Setup
If your genset has manual start only, we fit an AMF (automatic mains failure) controller — DeepSea or SmartGen — with sensible delays so a two-second PLN flicker doesn't start the engine.
Safety Interlocks & Testing
Mechanical and electrical interlocks guarantee genset power can never feed back into the PLN grid. We finish with live blackout simulations until the changeover is boringly reliable.
Pricing (IDR)
| Service | Guide Price (IDR) | Notes |
|---|---|---|
| Single-phase villa ATS | 4,500,000 – 7,000,000 | Panel + wiring + testing |
| Three-phase ATS | 7,000,000 – 12,000,000 | Commercial and large villas |
| AMF controller retrofit | 3,000,000 – 6,000,000 | Adds auto-start to manual gensets |
| Changeover service & repair | 850,000 – 2,500,000 | Existing ATS fault diagnosis |
How We Work
System Check
Photos of your genset control panel and distribution board over WhatsApp tell us 90% of what we need — including whether you need an AMF controller.
Quote
Fixed price for panel, wiring and testing. Same-day in most cases.
Installation
One day for most villa systems. Power interruption during connection is about 30–60 minutes — we schedule it around your needs.
Blackout Simulation
We kill the mains repeatedly and watch the system start, transfer, and return — adjusting delays so it behaves sensibly on flickers.
Handover
You get the wiring sketch, controller settings record, and a demonstration. 12-month warranty on the panel and our wiring.
FAQ
How fast does an ATS switch to generator power?
Will an ATS work with my existing generator?
Can the system notify my phone when the generator runs?
Does an ATS need maintenance?
Areas We Cover
We provide this service across all of south and central Bali:
Need This Sorted?
WhatsApp us your details — we reply with an honest assessment and a fixed quote the same day. Emergency callouts run 24/7.
Order in WhatsApp